Research on the construction path of Yiwu sponge city during the 14th Five-Year Plan period

Authors

  • Linqi Gu
  • Yong Liang
  • Jiang Cheng

DOI:

https://doi.org/10.56028/aehssr.4.1.212.2023

Keywords:

water shortage; priority construction areas; non-priority construction areas; management and control requirements; water-saving sponge city.

Abstract

During the 13th Five-Year Plan period, Yiwu City has made great achievements in sponge city construction, and won special financial support from Zhejiang Province in 2021. In order to better promote Yiwu sponge city construction through demonstration role, this paper, based on the current situation and problems in Yiwu City, puts forward the construction path of Yiwu sponge city during the 14th Five-Year Plan period according to the national, provincial and municipal construction objectives, discusses the current prominent problems and strategies of water shortage, and looks forward to the effectiveness of sponge city construction, which can provide references for sponge city construction in Yiwu City and even other regions.

Downloads

Published

2023-03-13